-
Notifications
You must be signed in to change notification settings - Fork 170
Pull requests: openshift/cluster-logging-operator
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
WIP:Preventively add 'structured' path segment
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
Update maxOpenShiftVersion to match release build
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
release/6.4
#3192
opened Jan 28, 2026 by
xperimental
Loading…
LOG-8615: Update tools and code for go 1.24
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
midstream/Dockerfile
A Dockerfile.in sync is needed with midstream
release/6.2
#3189
opened Jan 27, 2026 by
jcantrill
Loading…
LOG-8570: Update linter for go 1.24 and fix lint failures
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
midstream/Dockerfile
A Dockerfile.in sync is needed with midstream
release/6.4
#3179
opened Jan 15, 2026 by
jcantrill
Loading…
Add proxy feature to loki output
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#3177
opened Jan 9, 2026 by
Lune-Mercier
Loading…
LOG-6385: Refactor audit input generation to use struct
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#3175
opened Jan 7, 2026 by
jcantrill
Loading…
doc: Article on high volume log loss.
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
release/6.4
#3166
opened Dec 4, 2025 by
alanconway
Loading…
WIP:try Vector v0.50 DO-NOT-MERGE
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
lifecycle/stale
Denotes an issue or PR has remained open with no activity and has become stale.
#3139
opened Oct 17, 2025 by
vparfonov
Loading…
LOG-7892: support NDJSON for http sink
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
release/6.4
#3074
opened Jul 2, 2025 by
AndrewChubatiuk
Loading…
ProTip!
Find all pull requests that aren't related to any open issues with -linked:issue.